Chapter 8: Installing the Switch on a Wall
156
Installing the Switch on the Plywood Base
This procedure assumes that the plywood base for the switch is already
installed on the wall. Please review “Reviewing Safety Precautions” on
page 98 and “Choosing a Site for the Chassis” on page 104 before
performing this procedure. Allied Telesis recommends a minimum of three
people for this procedure.
Warning
The device is heavy. Always ask for assistance before moving or
lifting it to avoid injuring yourself or damaging the equipment.
Warning
The device should be installed on the wall by a qualified building
contractor. Serious injury to yourself or others or damage to the
equipment may result if it is not properly fastened to the wall.
E105
Allied Telesis recommends installing the power supplies and optional
XEM2 Line Card before installing the switch on a wall. For instructions,
refer to “Installing PWR600 AC Power Supplies” on page 116 and
“Installing an Optional XEM2 Ethernet Line Card” on page 130.
To install the switch on the plywood base, perform the following
procedure:
1. Place the switch in a table.
2. Install the four brackets with the sixteen screws that come with the
switch to the sides of the unit, as shown in Figure 92.
Figure 92. Installing the Brackets to the Switch for Wall Installation
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...