Chapter 9: Installing the Switch in the RKMT-SL01 Sliding Rack
182
Installing the Inner Rails on the Switch
The sides of the x950-28XSQ and x950-28XTQm switches have two sets
of bracket screw holes. The smaller M3 holes are for the standard
brackets that come with the switch and the larger M4 screw holes are for
the inner rails of the RKMT-SL01 sliding rack. The inner rails are attached
to the switch with four M4 screws on each side. Figure 113 identifies the
respective screw holes on the sides of the switch and inner rails.
Figure 113. Inner Rail Screw Holes for the x950-28XSQ and x950-
28XTQm Switches
The x950-52XSQ switch has only M4 holes on its two sides. The holes are
used for both the standard brackets included with the device and the rails
for the sliding equipment rack. Figure 114 identifies the screw holes for
attaching the inner rails to the switch.
Figure 114. Inner Rail Screw Holes for the x950 Switch
Attach the inner rails to the switch using eight M4 screws included with the
sliding rack. Be sure that the UP arrows on the rails are pointing up and
that the extension brackets extend in front of the switch. Refer to Figure
Front of
Switch
Front of
Switch
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...