97
Chapter 4
Beginning the Installation
The chapter contains the following sections:
“Reviewing Safety Precautions” on page 98
“Installation Options” on page 103
“Choosing a Site for the Chassis” on page 104
“Unpacking the Switch” on page 105
“Verifying the Accessory Kit” on page 109
“Unpacking the PWR600 AC Power Supply” on page 111
Summary of Contents for x950 Series
Page 12: ...Figures 12 ...
Page 18: ...Preface 18 ...
Page 50: ...Chapter 1 Overview 50 ...
Page 70: ...Chapter 2 XEM2 Ethernet Line Cards 70 ...
Page 134: ...Chapter 5 Installing Power Supplies and Optional XEM2 Line Card 134 ...
Page 146: ...Chapter 7 Installing the Switch in an Equipment Rack 146 ...
Page 162: ...Chapter 8 Installing the Switch on a Wall 162 ...
Page 224: ...Chapter 12 Powering On and Verifying the Stack 224 ...
Page 256: ...Chapter 14 Replacing Modules 256 ...