508144-01
Page 14 of 42
Issue 2128
FLOW
AIR
Vent Pipe
Pressure Switch
Flue
Transition
Cover Plate
Make-Up Box
Collector Box
Figure 20. Horizontal Left Position
Top Vent Discharge
•
Disconnect pressure switch hose from barbed fitting on the
pressure switch assembly. Remove pressure switch assembly
(1 screw) and cut wire tie to free pressure switch wires. Reinstall
pressure switch on the other side of orifice plate and reconnect
pressure switch hose.
•
Resecure pressure switch wires: Either pull excess wires
through the blower compartment and secure using supplied
wire tie, or coil excess wire and secure to the gas manifold.
Figure 21. Horizontal Left Position
Side Vent Discharge
FLOW
AIR
Pressure Switch
Flue Transition
Make-Up Box
Collector Box
•
Disconnect pressure switch hose from barbed fitting on the
pressure switch assembly. Remove pressure switch assembly
(1 screw) and cut wire tie to free pressure switch wires. Reinstall
pressure switch on the other side of orifice plate and reconnect
pressure switch hose.
•
Resecure pressure switch wires: Either pull excess wires
through the blower compartment and secure using supplied
wire tie, or coil excess wire and secure to the gas manifold.
Figure 22. Horizontal Right Position
Top Vent Discharge
FLOW
AIR
Pressure Switch
Vent Pipe
Flue Transition
Cover Plate
Collector Box
Make-Up Box
•
Gas supply piping must be brought into the unit from the bottom
in order to accommodate the flue pipe.
•
Remove make-up box assembly (2 screws) and cut wire tie to
free make-up box wires. Reinstall make-up box on other side
of cabinet.
•
Resecure make-up box wires: Either pull excess wires through
the blower compartment and secure using supplied wire tie, or
coil excess wire and secure to the gas manifold.
Figure 23. Horizontal Right Position
Side Vent Discharge
FLOW
AIR
make up box
Pressure Switch
Flue
Transition
Collector Box