507270-03
Page 58 of 60
Issue 1621
Gas Supply Pressure
SUPPLY
AIR
Line Voltage
GAS SUPPLY
Natural Gas
LP Propane Gas
Piping Connections Tight
Leak Tested
1
INTAKE / EXHAUST PIPE
All Joints Primed and Glued
Terminations Installed Properly
Pipes Supported
Condensate Trap Primed / Line Sloped
Heat Cable Installed and Operable (if applicable)
2
2
2
1
Horizontal Pipes Sloped (if applicable)
UNIT SET UP
3
4
Flter
RETURN AIR
Furnace:
Model Number_______________
Serial Number_________________
3
DUCT SYSTEM
SUPPLY AIR DUCT
Sealed
Insulated (if necessary)
RETURN DUCT
Sealed
Filter Installed and Clean
Grilles Unobstructed
4
VOLTAGE CHECK
Supply Voltage _____
Electrical Connections Tight
1
Start-Up & Performance Check List
Summary of Contents for 92G1UH-P
Page 3: ...507270 03 Page 3 of 60 Issue 1621 EXPANDED VIEW Figure 1 ...
Page 22: ...507270 03 Page 22 of 60 Issue 1621 Figure 26 Figure 25 ...
Page 26: ...507270 03 Page 26 of 60 Issue 1621 Figure 31 ...
Page 27: ...507270 03 Page 27 of 60 Issue 1621 Figure 32 ...
Page 29: ...507270 03 Page 29 of 60 Issue 1621 Figure 36 ...
Page 30: ...507270 03 Page 30 of 60 Issue 1621 Figure 37 ...
Page 37: ...507270 03 Page 37 of 60 Issue 1621 Figure 55 Trap Drain Assembly Using 1 2 PVC or 3 4 PVC ...
Page 39: ...507270 03 Page 39 of 60 Issue 1621 Figure 58 Figure 57 ...
Page 40: ...507270 03 Page 40 of 60 Issue 1621 Table 10 ...
Page 43: ...507270 03 Page 43 of 60 Issue 1621 TYPICAL WIRING DIAGRAM Figure 63 ...
Page 50: ...507270 03 Page 50 of 60 Issue 1621 ...
Page 51: ...507270 03 Page 51 of 60 Issue 1621 ...
Page 52: ...507270 03 Page 52 of 60 Issue 1621 BLOWER DATA A95UH1D 95F1UHD ...