28
PRE-OPERATION SETUP
Work site safety considerations
Visually inspect the equipment to ensure
that all instructions and decals are in place
and legible.
Inspect the light tower locking bar latch
assembly, which locks the light tower in the
vertical position for proper operation.
(Laydown Tower only).
Check the hitch assembly and safety chains.
Check the outriggers and jacks to make
sure they operate properly.
Inspect the light assemblies for damage and
test for proper operation.
Ground Surface
Check the ground conditions where you intend
to set up the light tower trailer. The ground must
offer firm, stable footing for the outriggers and
jacks. The area must be flat and level.
Wind
The light tower will remain operational in sus-
tained winds up to 92 km/h (57 mph) when
properly positioned on firm level ground, with
the outriggers and jacks properly positioned,
and the light tower fully raised.
Pre - Operation Check list
Always perform the following checks before
traveling to the work site and before operation.
Repair or replace any components as required
before operation.
Overhead Obstructions
Position the light tower trailer where there are
no overhead obstructions. Ensure that there is
sufficient clearance from structures, trees and
wires before raising the light tower.
Inspect the electrical wiring for signs of
damage.
Check the ground rod cable and ground lug.
Make sure they are clean, undamaged and
functional.
Inspect the tires to ensure good condition
and proper inflation.
OPERATION
Not
for
Reproduction
Summary of Contents for MAXI-LITE AS3000
Page 46: ...46 MAINTENANCE RECORD DATE SERVICE DESCRIPTION SERVICED BY N o t f o r R e p r o d u c t i o n...
Page 47: ...47 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 48: ...48 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 49: ...49 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 50: ...50 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 51: ...51 SCHEMATICS N o t f o r R e p r o d u c t i o n...
Page 52: ...52 WARRANTY N o t f o r R e p r o d u c t i o n...
Page 53: ...53 WARRANTY N o t f o r R e p r o d u c t i o n...