CONCRETE PAD FOR
SW-300DC
24”
24”
24”
9.5”
13.5”
4”
23”
25.5”
Operator plastic
Cover
Operator frame
1
/
2
1
/
2
Four red head
Bolts
”
”
X 3
Area for Conduit(s)
Operator Concrete
Pad
When possible
Install 4” above
Ground
Footing for
Gate operator
Master/Slave
Single Conduit for
Low voltage
High voltage
conduit
5