SolShare

Installation Manual

Summary of Contents for SolShare SOLSHARE-3P-35A-03

Page 1: ...1 SolShare Installation Manual...

Page 2: ...2...

Page 3: ...eling section Updated Commissioning section V4 1 18 08 2021 Updated links Updated Commissioning Document V5 0 23 08 2021 Updated to reflect product changes associated with the removal of 4G dongle and...

Page 4: ...Installation site selection B Installation III Electrical connection A Input output connections B Running current transformer tails C Labeling IV Commissioning A Preparing the SolShare for commissioni...

Page 5: ...upport allumeenergy com au with any queries List of supplementary documents available online For most up to date versions of all documents including this Installation Manual scan this QR code or go to...

Page 6: ...er name Company Electrician license number Allume SIP training certification number SolShare Connection Unit Connected eg Apt 1 Unit B Common light power No connection Single Phase Three Phase R1 W1 B...

Page 7: ...appears at grounding points within the SolShare equipment This symbol is also used in the manual Handling and Safety Instructions SAFETY SYMBOLS INFORMATION The following safety symbols are used in th...

Page 8: ...uipment Any violation could result in personal death or injury or damage to the device Installation is only to be conducted by a certified electrician This guide is provided to help the installer unde...

Page 9: ...itch Inverter Supply is required on each output ideally located within the unit main switchboard between the SolShare and each unit s main switch In series with this additional SolShare Maintenance Is...

Page 10: ...able commissioning and ongoing monitoring Do not mount the SolShare on flammable wall material 90 Mounted Vertically Do not mount the SolShare near flammable material or gases 90 Mounted Vertically En...

Page 11: ...ecure the mounting brackets to the chosen wall for installation Allume Energy recommend using the provided fasteners to attach the brackets into a suitable stone or masonry wall If another wall materi...

Page 12: ...inals Retain screws to replace later Important The cover should lock into place when it s pulled up properly Before beginning wiring ensure cover is locked in place by pulling down firmly To bring cov...

Page 13: ...ram above Warning The SolShare may divert all solar energy to any one unit in a point in time As a result all input output cables should be sized for maximum solar energy output The AC cables Please c...

Page 14: ...d have been designed in accordance to the SolShare System and SLD Design Guidelines If no project SLD exists please contact project owner or system design engineer For ease of isolation of the SolShar...

Page 15: ...output power cables to appropriate length to reach from SolShare Maintenance Isolators Grid Label both ends of these cables with the tenancy number 3 If using SolShare Maintenance Isolators Grid Run c...

Page 16: ...se 3 Repeat steps 1 2 for white and blue phase connector blocks 4 Plug each CT connector block into the corresponding socket of the SolShare Important Make sure colours and orientation of connectors a...

Page 17: ...on inverter s before working on meter panel Warning Shared Solar System To isolate a single unit 1 Turn off their MAIN SWITCH INVERTER SUPPLY 2 Turn off their MAIN SWITCH NORMAL SUPPLY X X X X X X M1...

Page 18: ...nter the SSID and password of the Wifi network that you want the SolShare to connect to 4 Once you see a confirmation page in the browser wait for the SolShare to reboot 5 Disconnect your device from...

Page 19: ...19...

Page 20: ...tallations in Australia Specifications are subject to changes without advanced notification For the most up to date documentation vist www allumeenergy com Allume Energy Ltd www allumeenergy com info...