32
•
Do not CHANGE DIRECTION on kerbs, rocks or appreciable differences in level (> 20 cm) when
driving the machine. In this case, always proceed perpendicularly to the
obstacles.
•
If you must drive up a slope, do not change direction when the ground
changes from flat to sloping. If this is absolutely necessary, perform the
manoeuvre gradually.
•
Do not drive along the edge of slopes or over uneven ground with one
track horizontal and the other slanting or partially raised (>10°) as this
will damage the tracks. ALWAYS PROCEED WITH THE TRACK
SHOES RESTING ON THE SAME HORIZONTAL PLANE.
•
Driving over an obstacle creates a gap between the bearing rollers and
track, which could consequently slip out of its housing.
•
If you change direction in a situation where the track could move sideways owing to an obstruction,
the track could slip out of its housing.
•
Check to make sure that there are no bystanders near moving parts when the platform is lowered.
Warning:
for inclined floors, pay attention to the correct LEVELLING direction.
Avoid inclining the
platform beyond what is necessary towards the lower side of the platform!
Summary of Contents for BiBi 850 HE
Page 6: ...5 Chapter 1 General information...
Page 10: ...9 1 6 Performances H I A B L F E C G...
Page 19: ...18 Chapter 2 Safety information...
Page 24: ...23...
Page 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Page 40: ...39 Chapter 3 Machine Description...
Page 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Page 42: ...41 View from A 20 22 21 23 24...
Page 43: ...42 12 8 25 16...
Page 44: ...43 17 2 26...
Page 45: ...44 3...
Page 56: ...55...
Page 59: ...58 Chapter 4 Instructions for use...
Page 68: ...67...
Page 69: ...68 For more information refer to Engine Use maintenance manual...
Page 71: ...70...
Page 72: ...71 For more information refer to Engine Use maintenance manual...
Page 91: ...90 Chapter 5 Emergency procedures...
Page 94: ...93 Chapter 6 Maintenance...
Page 105: ...104 Electrical panel casing Battery 1...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 133: ...132...
Page 136: ...135 HATZ ENGINE...
Page 137: ...136...
Page 138: ...137...
Page 139: ...138 Chapter 7 Demolition...
Page 141: ...140 APPENDICES...
Page 142: ...141 Appendix 1 Declaration of conformity...
Page 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...