34
Note:
The platform is fitted with a “crush-preventing” system (ref. Point 5.4.4 EN 280), which gets
enabled when the platform lowers and temporarily blocks it to allow the operator to make sure there
are no bystanders near the machine.
2.8
Precautions when work terminates or is interrupted
•
It is forbidden
to leave the MEWP unattended without having first stopped the engine and removed
the keys from the control panel to prevent the machine from being used by unauthorized persons
2.9
Safety regulations during maintenance
The maintenance operations described in this Manual refer to platforms in conditions of normal use. In
heavy duty use conditions (e.g. extreme temperatures, dust and corrosive substances in the
environment, etc.), inform the ALMAC S.r.l. assistance services to have the maintenance intervals
checked and changed.
The MAINTENANCE operations must only be performed by authorized and adequately trained
personnel.
Only perform the MAINTENANCE and ADJUSTMENT operations described in this Manual. Contact
the ALMAC S.r.l. assistance service only, if other operations are required (e.g. if faults occur).
Summary of Contents for BiBi 850 HE
Page 6: ...5 Chapter 1 General information...
Page 10: ...9 1 6 Performances H I A B L F E C G...
Page 19: ...18 Chapter 2 Safety information...
Page 24: ...23...
Page 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Page 40: ...39 Chapter 3 Machine Description...
Page 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Page 42: ...41 View from A 20 22 21 23 24...
Page 43: ...42 12 8 25 16...
Page 44: ...43 17 2 26...
Page 45: ...44 3...
Page 56: ...55...
Page 59: ...58 Chapter 4 Instructions for use...
Page 68: ...67...
Page 69: ...68 For more information refer to Engine Use maintenance manual...
Page 71: ...70...
Page 72: ...71 For more information refer to Engine Use maintenance manual...
Page 91: ...90 Chapter 5 Emergency procedures...
Page 94: ...93 Chapter 6 Maintenance...
Page 105: ...104 Electrical panel casing Battery 1...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 133: ...132...
Page 136: ...135 HATZ ENGINE...
Page 137: ...136...
Page 138: ...137...
Page 139: ...138 Chapter 7 Demolition...
Page 141: ...140 APPENDICES...
Page 142: ...141 Appendix 1 Declaration of conformity...
Page 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...