54
3.3.5
Power (electric) cut-out devices
The basket can be fitted with a 220 V power socket to supply the power tools required during
work. For safety reasons, a device is installed so as to cut-out the electricity supply in case of
over-voltage or short-circuit (
2
), located inside the right rear casing (pos.
1
in the photo below).
To access the device, unscrew the knobs (
3
) on the casing and remove the guard. When finished,
replace the guard that was previously removed and thoroughly tighten the knobs.
The battery isolator (
4
) is located in the same position. It physically disconnects the 12v electric
line coming from the battery and supplies the various users.
BE SURE TO OPERATE THIS DEVICE AT THE END OF THE WORK DAY.
Near the access ladder (see Figure "A") and life-saving devices (figure "B") there are also
security fuses to protect the 12V electrical equipment.
1
2
3
4
Summary of Contents for BiBi 850 HE
Page 6: ...5 Chapter 1 General information...
Page 10: ...9 1 6 Performances H I A B L F E C G...
Page 19: ...18 Chapter 2 Safety information...
Page 24: ...23...
Page 25: ...24 2 3 2 Warning command danger identification and instruction signs...
Page 40: ...39 Chapter 3 Machine Description...
Page 41: ...40 3 1 Structure of the machine 2 4 5 6 7 9 10 11 13 14 19 27 28 15 18...
Page 42: ...41 View from A 20 22 21 23 24...
Page 43: ...42 12 8 25 16...
Page 44: ...43 17 2 26...
Page 45: ...44 3...
Page 56: ...55...
Page 59: ...58 Chapter 4 Instructions for use...
Page 68: ...67...
Page 69: ...68 For more information refer to Engine Use maintenance manual...
Page 71: ...70...
Page 72: ...71 For more information refer to Engine Use maintenance manual...
Page 91: ...90 Chapter 5 Emergency procedures...
Page 94: ...93 Chapter 6 Maintenance...
Page 105: ...104 Electrical panel casing Battery 1...
Page 116: ...115...
Page 117: ...116...
Page 118: ...117...
Page 119: ...118...
Page 120: ...119...
Page 123: ...122...
Page 124: ...123...
Page 125: ...124...
Page 133: ...132...
Page 136: ...135 HATZ ENGINE...
Page 137: ...136...
Page 138: ...137...
Page 139: ...138 Chapter 7 Demolition...
Page 141: ...140 APPENDICES...
Page 142: ...141 Appendix 1 Declaration of conformity...
Page 144: ...143 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 157: ...156 Appendix 4 Hydraulic diagram Appendix 5 Circuit diagram...