PAGE
101
ALMAC s.r.l.
ATTENTION: BE CAREFUL WHEN THE TRACK FALLS TO THE GROUND.
1.
Lift the track at the lower centre line;
2.
Pull the track (outwards), prying between the track itself and the idler
wheel;
3.
To install the new track, proceed as indicated in the previous points, but
in reverse order;
4.
The track is correctly tensioned by using the tensioning kit, pumping
grease until the pressure indicated on the technical data sheet has been
reached.
WARNING: before performing the tensioning of the track, check the technical
data sheet for the correct pressure expressed in bar.
Summary of Contents for MULTI-LOADER 2.5
Page 41: ...PAGE 41 ALMAC s r l...
Page 67: ...PAGE 67 ALMAC s r l A number of examples follow...
Page 68: ...PAGE 68 ALMAC s r l...
Page 69: ...PAGE 69 ALMAC s r l...
Page 105: ...PAGE 105 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Page 107: ...PAGE 107 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 117: ...PAGE 117 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...