PAGE
78
ALMAC s.r.l.
6
Maintenance
6.1
General maintenance
The main maintenance interventions and the frequencies with which they must
be carried out are given in the chart below.
6.1.1
Ordinary maintenance schedule table
The checks and maintenance operations must be performed as indicated in the
table below.
KEY
A.
Whenever the machine is
used
D. monthly or every 100 hours G. annually or every 1500 hours
B.
Daily or every 10 hours
E. every two months or every
250 hours
H. after long periods of inactivity (30 days)
C.
Weekly or every 50 hours
F. quarterly or every 500
hours
* Refer to the engine use and maintenance
manual
ORDINARY MAINTENANCE SCHEDULE TABLE
A
B
C
D
E
F
G
H
10 50 100 250 500 1500
Visual and functional checks as specified
X
X
Discharge filter cartridge replacement
X
X
Suction filters replacement
X
X
Check the hydraulic oil level
X
X
Change the hydraulic oil
X
Track reduction gear oil level inspection
X
X
Replace oil in the track reduction gear
X
Track inspection and tensioning
X
X
Check the condition of the tracks
X
X
Check the tightening of nuts and bolts (general checks)
X
Check using a torque wrench the tightening of screws and bolts
for fixing of the tracked chassis to the machine frame, the
screws M16 class8.8 tightening torque 193 Nm (after the first
50 hours)
X
Structural inspection (visual)
X
X
X
Structural inspection (through checking of metal parts and
welds)
X
X
Manual emergency devices
X
X
Check the correct operation of the 230V outlet differential
X
X
Check and replace the fuses
X
X
Check the maximum pressure valve
X
Check the main system angle sensors
X
X
Summary of Contents for MULTI-LOADER 2.5
Page 41: ...PAGE 41 ALMAC s r l...
Page 67: ...PAGE 67 ALMAC s r l A number of examples follow...
Page 68: ...PAGE 68 ALMAC s r l...
Page 69: ...PAGE 69 ALMAC s r l...
Page 105: ...PAGE 105 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Page 107: ...PAGE 107 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 117: ...PAGE 117 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...