PAGE
82
ALMAC s.r.l.
6.2.2
Visual and structural inspection
Visually check the following points according to the schedule indicated in the
general chart. Immediately inform a maintenance technician if faults are
discovered.
•
Frame state;
•
State of the bi-levelling structure and of the tracked chassis;
•
In particular check if there is any rust in the structure;
•
State of the rubber tracks;
•
Oil leaking;
•
Pins and stop devices.
6.2.3
Damage to tubes and cables
Visually check at the frequencies indicated in the general chart to make sure
that the articulation point of the hydraulic hoses and electric cables are not
misshapen or damaged. Examples of such faults are shown on the photos below.
Damaged hydraulic hose pipe
Damaged electric cable
Summary of Contents for MULTI-LOADER 2.5
Page 41: ...PAGE 41 ALMAC s r l...
Page 67: ...PAGE 67 ALMAC s r l A number of examples follow...
Page 68: ...PAGE 68 ALMAC s r l...
Page 69: ...PAGE 69 ALMAC s r l...
Page 105: ...PAGE 105 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity FAC SIMILE...
Page 107: ...PAGE 107 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 117: ...PAGE 117 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...