Note:
Meter patch cable for backup box is different from backup patch cable for
backup box. Meter patch cable for backup box must be connected in the right place
as the diagram shows.
Note:
Operated by qualified electrician only.
Note:
The position where the fuse holder is installed in the distribution box is not
specified. The installer can adjust the installation position of the fuse holder
according to the actual installation scenario. The length of the related wire harness
on the fuse holder can be adjusted according to the actual needs. The terminals will
be in the parts list.
04
SUMMARY
03
Communication Port RJ45
Fault
Backup
Grid
Communication Lost/Relay
Backup Normal
Grid Normal
Communication Cable Specification
Backup Box COM
Inverter/EMS Meter Port
Meter Patch Cable for Backup Box
RJ45 Connector
RJ45 Connector
CAT5 Recommended as Patch Cable
1
2
3
4
5
6
7
8
RJ45
Mode
Dimension
1.4 Installation of Fuse Holder
SMILE-T10 Connection
Mode
System
DIP Switch
Description
Single Phase
Three Phase
Power Resumption
Latency Time 310s
Normal Power
Resumption
SMILE5/SMILE-B3
SMILE-T10
1
1
4
4
SMILE5/SMILE-B3/SMILE-T10
SMILE5/SMILE-B3/SMILE-T10
Turn on DIP switch 4
Turn off DIP switch 4.
Turn on DIP switch 1.
Turn off DIP switch 1.
Connect the power cables from BackupBox Load – L1, L2, L3 to the top of the fuse holder, and then
connect cables from the bottom to the load.
NC
NC
RS485-A (Backup for Storion-T5)
RS485-A (Meter)
RS485-B (Meter)
RS485-B (Backup for Storion-T5)
NC
NC
NC
NC
RS485-A
—
—
RS485-B
NC
NC
GR
ID
_L
2
GR
ID
_L
3
GR
ID
_N
GR
ID
_P
E
Storion-
SMILET10
PV-INV
BACKUP
AC
PV
PV
Ba
t
meter
LOAD3
LOAD2
LOAD1
GRID
DSP_BackupBox
BA
K_
N
AC
_N
LO
AD
_N
BA
K_
L3
AC
_L
3
LO
AD
_L
3
BA
K_
L2
AC
_L
2
LO
AD
_L
2
BA
K_
L1
AC
_L
1
LO
AD
_L
1
Ś
ś
PV
-IN
V_
PE
PV
-IN
V_
N
PV
-IN
V_
L3
PV
-IN
V_
L2
GR
ID
_L
1
PV
-IN
V_
L1
CO
M
patch cable
Meter Port
RCD
FU
SE
meter patch cable
for backup box
N
PE
L3
L2
L1
GR
ID
_L
2
GR
ID
_L
3
GR
ID
_N
GR
ID
_P
E
SMILE-B3
SMILE5
PV-INV
BACKUP
AC
PV
PV
Ba
t
meter
LOAD3
LOAD2
LOAD1
GRID
DSP_BackupBox
BA
K_
N
AC
_N
LO
AD
_N
BA
K_
L3
AC
_L
3
LO
AD
_L
3
BA
K_
L2
AC
_L
2
LO
AD
_L
2
BA
K_
L1
AC
_L
1
LO
AD
_L
1
Ś
ś
PV
-IN
V_
PE
PV
-IN
V_
N
PV
-IN
V_
L3
PV
-IN
V_
L2
GR
ID
_L
1
PV
-IN
V_
L1
CO
M
Patch Cable recommend CAT5
Meter Port
RC
D
FU
SE
meter patch cable
for backup box
N
PE
L3
L2
L1
Note:
1. Hybrid coupled with
①
and
②
. DC coupled with
②
. AC coupled with
①
2. The load power of each phase must be within 5kW.
06
INSTALLATION
05
SMILE5/SMILE-B3 Connection (single phase grid in house)
GR
ID
_L
2
GR
ID
_L
3
GR
ID
_N
GR
ID
_P
E
Storion-
SMILET10
PV-INV
BACKUP
AC
PV
PV
Ba
t
meter
LOAD3
LOAD2
LOAD1
GRID
DSP_BackupBox
BA
K_
N
AC
_N
LO
AD
_N
BA
K_
L3
AC
_L
3
LO
AD
_L
3
BA
K_
L2
AC
_L
2
LO
AD
_L
2
BA
K_
L1
AC
_L
1
LO
AD
_L
1
Ś
ś
PV
-IN
V_
PE
PV
-IN
V_
N
PV
-IN
V_
L3
PV
-IN
V_
L2
GR
ID
_L
1
PV
-IN
V_
L1
CO
M
Patch Cable recommend CAT5
Meter Port
RC
D
FU
SE
meter patch cable
for backup box
N
PE
L3
L2
L1
GR
ID
_L
2
GR
ID
_L
3
GR
ID
_N
GR
ID
_P
E
SMILE-B3
SMILE5
PV-INV
BACKUP
AC
PV
PV
Ba
t
meter
LOAD3
LOAD2
LOAD1
GRID
DSP_BackupBox
BA
K_
N
AC
_N
LO
AD
_N
BA
K_
L3
AC
_L
3
LO
AD
_L
3
BA
K_
L2
AC
_L
2
LO
AD
_L
2
BA
K_
L1
AC
_L
1
LO
AD
_L
1
Ś
ś
PV
-IN
V_
PE
PV
-IN
V_
N
PV
-IN
V_
L3
PV
-IN
V_
L2
GR
ID
_L
1
PV
-IN
V_
L1
CO
M
Patch Cable recommend CAT5
Meter Port
RC
D
FU
SE
meter patch cable
for backup box
N
PE
L
①
②
①
②
Note:
Hybrid coupled with
①
and
②
. DC coupled with
②
. AC coupled with
①
.
①
②
②
①
INSTALLATION
INSTALLATION
It is not allowed to connect the cable as the following :
Dimension
SMILE5/SMILE-B3 Connection (three phase grid in house)
Or/W
G/W
G/W
BI/W
Br/W
Br
Br
Br/W
BI/W
Or
Or
BI
G
G
BI
Or/W
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
RJ45 Connector
RJ45 Connector
Or/W
G/W
BI
BI/W
Br/W
Br
Br
Br/W
G
Or
Or
G/W
BI/W
G
BI
Or/W
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
127
AC
GRID
ON-GRID INV
N
PE
N
L3
L2
L1
BAKLOAD AC
L3
BAK LOAD AC
L2
BAK LOAD AC
L1
BAK LOAD
208
45
46
67
OFF
ON
COM
OFF
ON
COM
INSTALLATION
02