background image

Note:

  Meter patch cable for backup box is different from backup patch cable for 

backup box. Meter patch cable for backup box must be connected in the right place 

as the diagram shows.

Note:

  Operated by qualified electrician only.

Note:

  The position where the fuse holder is installed in the distribution box is not 

specified. The installer can adjust the installation position of the fuse holder 

according to the actual installation scenario. The length of the related wire harness 

on the fuse holder can be adjusted according to the actual needs. The terminals will 

be in the parts list.

04

SUMMARY

03

Communication Port RJ45 

Fault
Backup
Grid

Communication Lost/Relay 
Backup Normal
Grid Normal

Communication Cable Specification

Backup Box COM

Inverter/EMS Meter Port

Meter Patch Cable for Backup Box

RJ45 Connector

RJ45 Connector

CAT5 Recommended as Patch Cable

1
2
3
4
5
6
7
8

RJ45

Mode

Dimension

1.4 Installation of Fuse Holder

SMILE-T10 Connection

Mode

System

DIP Switch

Description

Single Phase
Three Phase

Power Resumption 

Latency Time 310s

Normal Power 

Resumption

SMILE5/SMILE-B3

SMILE-T10

1
1

4

4

SMILE5/SMILE-B3/SMILE-T10

SMILE5/SMILE-B3/SMILE-T10

Turn on DIP switch 4

Turn off DIP switch 4.

Turn on DIP switch 1.
Turn off DIP switch 1.

Connect the power cables from BackupBox Load – L1, L2, L3 to the top of the fuse holder, and then 

connect cables from the bottom to the load.

NC
NC
RS485-A (Backup for Storion-T5)
RS485-A (Meter)
RS485-B (Meter)
RS485-B (Backup for Storion-T5)
NC
NC

NC
NC
RS485-A


RS485-B
NC
NC

 

GR

ID

_L

2

GR

ID

_L

3

GR

ID

_N

GR

ID

_P

E

Storion-

SMILET10

PV-INV

BACKUP

AC

PV

PV

Ba

t

meter

LOAD3

LOAD2

LOAD1

GRID

DSP_BackupBox

BA

K_

N

AC

_N

LO

AD

_N

BA

K_

L3

AC

_L

3

LO

AD

_L

3

BA

K_

L2

AC

_L

2

LO

AD

_L

2

BA

K_

L1

AC

_L

1

LO

AD

_L

1

Ś

ś

PV

-IN

V_

PE

PV

-IN

V_

N

PV

-IN

V_

L3

PV

-IN

V_

L2

GR

ID

_L

1

PV

-IN

V_

L1

CO

M

patch cable

Meter Port

RCD

FU

SE

meter patch cable 

for backup box

N

PE

L3

L2

L1

 

GR

ID

_L

2

GR

ID

_L

3

GR

ID

_N

GR

ID

_P

E

SMILE-B3

SMILE5

PV-INV

BACKUP

AC

PV

PV

Ba

t

meter

LOAD3

LOAD2

LOAD1

GRID

DSP_BackupBox

BA

K_

N

AC

_N

LO

AD

_N

BA

K_

L3

AC

_L

3

LO

AD

_L

3

BA

K_

L2

AC

_L

2

LO

AD

_L

2

BA

K_

L1

AC

_L

1

LO

AD

_L

1

Ś

ś

PV

-IN

V_

PE

PV

-IN

V_

N

PV

-IN

V_

L3

PV

-IN

V_

L2

GR

ID

_L

1

PV

-IN

V_

L1

CO

M

 Patch Cable recommend CAT5

Meter Port

RC

D

FU

SE

meter patch cable 

for backup box

N

PE

L3

L2

L1

Note:

  1. Hybrid coupled with 

 and 

. DC coupled with 

. AC coupled with 

2. The load power of each phase must be within 5kW.

06

INSTALLATION

05

SMILE5/SMILE-B3 Connection (single phase grid in house)

 

GR

ID

_L

2

GR

ID

_L

3

GR

ID

_N

GR

ID

_P

E

Storion-

SMILET10

PV-INV

BACKUP

AC

PV

PV

Ba

t

meter

LOAD3

LOAD2

LOAD1

GRID

DSP_BackupBox

BA

K_

N

AC

_N

LO

AD

_N

BA

K_

L3

AC

_L

3

LO

AD

_L

3

BA

K_

L2

AC

_L

2

LO

AD

_L

2

BA

K_

L1

AC

_L

1

LO

AD

_L

1

Ś

ś

PV

-IN

V_

PE

PV

-IN

V_

N

PV

-IN

V_

L3

PV

-IN

V_

L2

GR

ID

_L

1

PV

-IN

V_

L1

CO

M

 Patch Cable recommend CAT5

Meter Port

RC

D

FU

SE

meter patch cable 

for backup box

N

PE

L3

L2

L1

 

GR

ID

_L

2

GR

ID

_L

3

GR

ID

_N

GR

ID

_P

E

SMILE-B3

SMILE5

PV-INV

BACKUP

AC

PV

PV

Ba

t

meter

LOAD3

LOAD2

LOAD1

GRID

DSP_BackupBox

BA

K_

N

AC

_N

LO

AD

_N

BA

K_

L3

AC

_L

3

LO

AD

_L

3

BA

K_

L2

AC

_L

2

LO

AD

_L

2

BA

K_

L1

AC

_L

1

LO

AD

_L

1

Ś

ś

PV

-IN

V_

PE

PV

-IN

V_

N

PV

-IN

V_

L3

PV

-IN

V_

L2

GR

ID

_L

1

PV

-IN

V_

L1

CO

M

 Patch Cable recommend CAT5

Meter Port

RC

D

FU

SE

meter patch cable 

for backup box

N

PE

L

Note:

  Hybrid coupled with 

 and 

. DC coupled with 

. AC coupled with 

.

INSTALLATION

INSTALLATION

It is not allowed to connect the cable as the following :

Dimension

SMILE5/SMILE-B3 Connection (three phase grid in house)

Or/W

G/W

G/W

BI/W

Br/W
Br

Br

Br/W

BI/W

Or

Or
BI

G

G

BI

Or/W

1
2
3
4
5
6
7
8

1
2
3
4
5
6
7
8

RJ45 Connector

RJ45 Connector

Or/W

G/W

BI

BI/W

Br/W
Br

Br

Br/W

G

Or

Or
G/W

BI/W

G

BI

Or/W

1
2
3
4
5
6
7
8

1
2
3
4
5
6
7
8

127

AC

GRID

ON-GRID INV

N

PE

N

L3

L2

L1

BAKLOAD AC

L3

BAK LOAD AC

L2

BAK LOAD AC

L1

BAK LOAD

208

45

46

67

OFF

ON

COM

OFF

ON

COM

INSTALLATION

02

Reviews: