Installation
Installation
Step 1: Install the battery brackets on the battery with M5 screws
Step 2: Please drill four holes (two on each side) directly on the wall at the marking
positions of the brackets with an impact drill (bit φ 8.0mm, length 20cm) and the depth of
each hole should be about 7 cm.
Step 3: Insert the expansion tube into the drilled hole. Pass the expansion screw through
the gasket and lock with a screwdriver.
Installation method:
The location of bolted wall is the mark of the red circle is the bolted wall. Drilled the wall
with a Φ10 drill bit to a depth of 80mm, inserted the gray expansion pipe into the wall, and
then tightened the expansion screw.
Connection
Grounding
Grounding point is at left side of the battery, please ensure the grounding before switch on
the battery.
≥70mm
Ø
10mm
SW10
PH2
2.5N.m
M5*10
1
2
3
9mm