___________________________________________________________________
Alpha ESS Co., Ltd.
Page 54
Your Smart Energy
EMS Introduction and Set up
Step 6:
Check SOC Calibration function set No.
Step 7:
Check the Battery Ready function set
No. If you only use the inverter without battery,
please set it Yes.
Step 8:
Click the Grid Function to set up
relevant parameters about the grid
Step 9:
Set the Max. Feed in rate value.
Step 10:
Click Function-System Mode to set
system mode: DC, AC, Hybrid.
Step 11:
Click the mode then set up work
mode.(self-use or force time charge)
Step 12:
If you want to use force charge, sett
Enable here.
Step 13:
Set the charge and discharge time.
Step 14:
Set the UPS Reserve SOC, it means
how much battery energy to keep for UPS
function.