6.
Routine Maintenance
Maintenance Precautions
If the BESS is out of operation for repair, maintenance, relocation or decommissioning,
the following notes should be paid attention to:
DANGER: Improper maintenance of the equipment may result in personal
injury or equipment damage. The user must strictly follow the steps below before
performing any operations:
Related safety standards and specifications should be followed in operation,
repair, maintenance, relocation or decommissioning.
Disconnect all the electrical connections so that the equipment cannot be powered
on.
Wait at least 10 minutes after disconnection to make sure that the residual voltage
of capacitors are down to a safe value.
Use a suitably calibrated voltage tester to ensure the equipment is completely
disconnected.
CAUTION: Only qualified and authorized personnel can maintain the energy
storage system. Please do not allow any unrelated personnel to enter the
maintenance site! Two people should always be present while completing operation,
repair, maintenance, relocation or decommissioning.
Temporary warning signs or barriers must be posted during electrical connection
and maintenance work to prevent unrelated persons from entering the area where
electrical connections or maintenance are carried out.
Appropriate protective measures should be taken while working on the BESS
system for operation, repair, maintenance, relocation or decommissioning, see
section 2.13 for PPE required when completing these tasks
The batteries need to be charged to 30%~50% SOC rate when the whole system
is not energised/in use (meaning, the batteries has not been charged for two
weeks or longer), in case of over discharge.
If the system is not performing normally because of incorrect operating procedure,
please try to turn off all switches and restart the system following the right
procedures as described in the manual; if the system cannot be turned on
succesfully, please turn off all switches and contact AlphaESS
service
in a timely
manner.
The equipment can only be restarted after fault is cleared.
Wait for at least 1min to restart the system from a complete power failure.
The equipment does not contain spare parts. If any replacement service is
required, please contact with AlphaESS service.
Do not replace any components of this equipment without authorization. The
company will not bear any warranty or joint liability for the losses caused thereby.
Summary of Contents for Storion-T30
Page 1: ...Installation Operation Maintenance Manual Energy Storage System ESS Storion T30 V02 ...
Page 2: ......
Page 8: ......