030-706-J0 Rev B
Page 24 of 26
9
Maintenance
Although very little maintenance is required with Apha systems, routine checks and adjustments are
recommended to ensure optimum system performance. Qualified service personnel should do repairs.
The following table lists a few maintenance procedures for this system. These procedures should be performed at
least once a year.
WARNING: HIGH VOLTAGE AND SHOCK HAZARD.
Use extreme care when working inside the shelf while the system is energized.
Do not make contact with live components or parts.
Circuit cards, including RAM chips, can be damaged by static electricity. Always wear a grounded
wrist strap when handling or installing circuit cards.
Procedure
Date Completed
Clean ventilation openings
Inspect all system connections (re-torque as necessary)
Verify alarm/control settings
Verify alarm relay operation
Table G–Sample maintenance log
NOTE: There are no field replaceable parts.
Summary of Contents for 030-706-J0
Page 2: ......
Page 14: ......
Page 47: ...03070605B__ sch 1 Fri Mar 04 14 39 15 2005 ...
Page 48: ...03070605B__ sch 2 Fri Mar 04 14 39 49 2005 ...
Page 53: ...03070705B__ sch 1 Fri Mar 04 14 43 46 2005 ...
Page 54: ...03070705B__ sch 2 Fri Mar 04 14 44 27 2005 ...
Page 55: ...03070705B__ sch 3 Fri Mar 04 14 44 54 2005 ...
Page 61: ......
Page 62: ......
Page 63: ......