background image

 

0320008-J0   Rev B 

Page 

9

 

4.  Batteries 

4.1.  Battery Pack Discharge Times 

Table 1 Continuity 6K – 7Ah/12V (x 20pcs) 

Load (W)  1x BP Continuity 

6K 

2x BP Continuity 

6K 

3x BP Continuity 

6K 

4x BP Continuity 

6K 

1080 

0:42:48 

1:30:56 

2:16:25 

3:01:53 

1620 

0:25:48 

1:03:30 

1:41:13 

2:14:57 

2700 

0:12:26 

0:41:53 

1:02:50 

1:29:01 

3780 

0:08:30 

0:25:24 

0:46:53 

1:02:30 

4320 

0:07:06 

0:17:20 

0:41:36 

0:55:28 

5400 

0:04:57 

0:14:09 

0:27:35 

0:45:16 

 

Table 2 Continuity 10K – 9Ah/12V (x 20pcs) 

Load (W)  1x BP Continuity 

10K 

2x BP Continuity 

10K 

3x BP Continuity 

10K 

4x BP Continuity 

10K 

1800 

0:30:33 

1:15:11 

1:59:50 

2:39:46 

2700 

0:16:50 

0:53:52 

1:20:47 

1:54:27 

3600 

0:12:27 

0:41:58 

1:02:56 

1:29:10 

4500 

0:10:12 

0:27:55 

0:51:33 

1:08:44 

6300 

0:06:28 

0:15:46 

0:30:45 

0:50:28 

7200 

0:04:52 

0:13:55 

0:27:09 

0:44:33 

 

4.2.  Storage Instruction 

For extended storage in a moderate climate (-5 to +30 °C / 23 to +86 °F), the batteries should be charged for 12 

hours every 6 months by plugging the UPS power cord into the wall receptacle. Repeat this every 3 months at 

higher temperatures (+30 to +45 °C / +86 to +113 °F). Do not store batteries under conditions that are outside of 

this range. 

4.3.  Recycling Used Batteries 

 

 
Contact your local recycling or hazardous waste center for information on proper disposal of 

used batteries. 

 
 

 

 

Summary of Contents for Alpha Continuity 10K

Page 1: ...Alpha Continuity 6K 10K Battery Pack User Manual Document 0320008 J0 Effective 04 2012 ...

Page 2: ......

Page 3: ...pha is a registered trademark of Alpha Technologies No part of this documentation shall be reproduced stored in a retrieval system translated transcribed or transmitted in any form or by any means manual electric electronic electromechanical chemical optical or otherwise without prior explicit written permission from Alpha Technologies This document the software it describes and the information an...

Page 4: ...3 1 Unpacking 4 3 2 Selecting an Installation Position 5 3 3 Installation of Rack Tower kits 6 3 3 1 Tower Installation Combined with UPS 6 3 3 2 Rack Mount installation 7 3 4 Installation Procedure 8 4 Batteries 9 4 1 Battery Pack Discharge Times 9 4 2 Storage Instruction 9 4 3 Recycling Used Batteries 9 5 Specification 10 ...

Page 5: ... safety precautions CAUTION Follow battery manufacturer s safety recommendations when working around battery systems CAUTION Batteries are hazardous to the environment and should be disposed of safely at a recycling facility Consult the battery manufacturer for recommended local authorized recyclers CAUTION Do Not Dispose of Battery or Batteries in an open fire The battery may explode CAUTION Do n...

Page 6: ...nlight Your warranty will be void if the batteries fail due to overheating This battery pack is designed for indoor use only This battery pack is not designed for use in dusty corrosive and salty environment The warranty for this battery pack will be void if water or other liquid is spilt or poured directly onto the battery pack Similarly we do not warrant any damage to the battery pack if foreign...

Page 7: ...0320008 J0 Rev B Page 3 2 Rear Panel Components UPS Battery connector Electrical DC ...

Page 8: ...ck module is 54 2 to 65 2 kgs 119 to 143 lbs be cautious when unpacking and lifting the unit to avoid injury 1 Remove the packing materials 2 Take the battery pack out of the foam A standard package includes the following User manual DC connect cable C2 DC connect cable restraint C1 The Rack Tower kits A1 A3 B1 B3 C1 C2 and S1 S4 for rack mounted model A1 A2 A3 S1 S2 S3 S4 B1 B2 C1 C2 B3 x8 x6 x4 ...

Page 9: ... life of the batteries 1 Keep at least 20cm 8 inches clearance from the rear panel of the battery pack from the wall or other obstructions 2 Do not block the air flow to the ventilation openings of the unit 3 Ensure the installation site environmental conditions are in accordance with the battery pack working specifications to avoid overheat and excessive moisture 4 Do not place the battery pack i...

Page 10: ...0320008 J0 Rev B Page 6 3 3 Installation of Rack Tower kits 3 3 1 Tower Installation Combined with UPS STEP 1 STEP 2 S3 S1 UPS UPS BATTERY A3 ...

Page 11: ...0320008 J0 Rev B Page 7 3 3 2 Rack Mount installation STEP 1 STEP 2 S3 B1 B2 S4 B1 B3 S4 ...

Page 12: ...ttery G G DC Breaker 30A 250Vdc L12 N1 G1 L21 N22 G2 OUTPUT INPUT ON OFF S1 Ext Battery G Parallel Work Comm TNV Communication Network Bus Not Intended to EPO RS232 CB 1 Utility Input Breaker To UPS Battery To Extended Battery G G DC Breaker 30A 250Vdc Second Battery Bank First Battery Bank UPS ...

Page 13: ...4x BP Continuity 10K 1800 0 30 33 1 15 11 1 59 50 2 39 46 2700 0 16 50 0 53 52 1 20 47 1 54 27 3600 0 12 27 0 41 58 1 02 56 1 29 10 4500 0 10 12 0 27 55 0 51 33 1 08 44 6300 0 06 28 0 15 46 0 30 45 0 50 28 7200 0 04 52 0 13 55 0 27 09 0 44 33 4 2 Storage Instruction For extended storage in a moderate climate 5 to 30 C 23 to 86 F the batteries should be charged for 12 hours every 6 months by pluggi...

Page 14: ...VA Continuity 10000VA Battery Pack Model BP Continuity 6K BP Continuity 10K Part Number 0320007 001 0320008 001 Nominal System Voltage 240VDC 240VDC Dimensions W x D x H mm Unit 440 x 680 x 132 Shipping 560 x 804 x 272 Weight kg Unit 54 2 65 2 Shipping 57 2 68 2 ...

Page 15: ......

Page 16: ...sse 8 D 91126 Schwabach Germany Tel 49 9122 79889 0 Fax 49 9122 79889 21 Technologies Argus First de Mexico Anatole France Num 17 Colonia Polanco 11560 México D F Tel 52 55 5280 6990 Alpha Technologies Europe Ltd Twyford House Thorley Bishop s Stortford Hertfordshire CM22 7PA United Kingdom Tel 44 1279 501110 Fax 44 1279 659870 Alphatec Ltd 339 St Andrews St Suite 101 Andrea Chambers P O Box 56468...

Reviews: