29
2
Installation and Start Up
Alpha Technologies
2.5
Starting and Testing the MBP System (Continued)
TRANSFER
UPS
BY
P
A
S
S
4
Turn the MBP rotary switch to “UPS.”
Verify the load is receiving power. If not,
perform troubleshooting.
Start Up Finished