39
Index
Alpha Technologies
Sting voltage, battery .............................................
34
Support, technical ....................................................
5
Switching between Line and Battery modes .......
25
Delay in switching ............................................... 11
T
Technical support .....................................................
5
Temperature derating ............................................
35
Terminal block, specifications .................................
8
Test
After startup ....................................................... 11
Battery back up time .......................................... 28
Button, on control panel ...................................... 20
Self test .............................................................. 13
Time, battery back up, measuring ........................
28
Troubleshooting .......................................
13-16, 29-30
Turn off ....................................................................
11
Emergency shutdown procedure ... Inside rear cover
Power to loads .................................................... 33
Unit..................................................................... 11
Turn on unit .............................................................
11
With Manual Start Button .................................... 20
Turned on without line power, LEDs show ...........
24
U
Unpacking checklist .................................................
4
Using control panel to operate unit .................
20-25
V
Ventilation slots ......................................................
32
Voltage, boost/buck parameters ............................
35
Voltage
Battery string ...................................................... 34
Buck and Boost levels .................................. 22, 35
As battery discharges ......................................... 26
W
Warning
Label, attaching to utility panel ............................. 2
Low battery ......................................................... 23
Of discharged battery ......................................... 26
Of fault with unit ............................................. 14-16
Warranty repairs, return to factory........................
29
Wiring
According to local codes ...................................... 2
Batteries ............................................................... 9
Gauge................................................................... 8
Grounding specifications ...................................... 7
Standby generator ................................................ 7
To dedicated circuit breaker ................................. 7