3
INSTALLATION
1. Unpack and inspect reel for damage. Check for completeness.
2. The cord reel must be installed in premises comforming to current regulation and standards
covering systems and work environments.
3. Secure the cord reel to the wall and the ceiling according to the installation diagrams.Using
screw anchors or suitable screws which must be fitted in the holes in the brackets.
4. The appliance can also be used on the ground. The cord reels can be placed in place as
needed.
In the ceiling
on the wall
on the ground
OPERATION
1. Check reel for correct operation by slowly pulling out the cord.
2. To latch the reel, slowly pull out the cord to any point, release the cord to stop.
Note
:
It can not exceed the back end mark when the cord is pulled out.
Summary of Contents for GUR052
Page 1: ...ALPHAWORKS SMART CORD REEL OPERATOR MANUAL FCC ID 2AW8RCR400 IC 26378 CR400...
Page 2: ......
Page 7: ......
Page 8: ......