9400001-J1 Rev F
38
Procedure
1. Assemble the inter-bay bus work with the bolts that ship in the kit with the copper buses.
2. Once assembled, torque all bolts to 75 ft/lbs.
3. Proceed with final setting of the bay floor anchors.
Figure 31 — Example of Installed Inter-bay Buswork