SAFETY SHEET
HANDLING OPERATIONS
CAUSE OR ORIGIN OF HAZARD
.
Any handling operation may involve danger
:
-
for the personnel
,
-
for the equipment being handled
,
-
for the installations or equipment in the vic inity
.
WORK REQUIREMENTS.
As a general rule, handling operations must be carried out by personnel familiar with the basic
handling regulations, using equipment in good working order, and wearing the appropriate
protective clothing or equipment
.
Ensure that the condition of the cases is such that they can be safely handled (state of the wood,
shock-resistance, etc.).
SAFETY INSTRUCTIONS
.
OBSERVE ALL GENERAL INSTRUC TIONS G OVERNING INSTALLATION, C OMMISSIONING AND
OPERATION IN AC C ORDANC E WITH CURRENTLY AC C EPTED PRAC TICES AS WELL AS THOSE LAID
DO WN IN THE DOC UMENTATION SUPPLIED WITH THE EQUIPMENT.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...