Installation
Checking for presence of SF
6
gas in poles
G31--061EN04
2/4
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Pole checking when the cases are opened at site
Preparing the pole
Remove the cover and the side panels of the case. Remove partially packag-
ingprotection to free the housing to can reach thefilling device into theoperat-
ing mechanism..
.
FKG1N/F/X/XV/XW
Visual inspection
of the pôles
It is of prime importance that the presence of SF
6
gas in pole be
verified before going any further with installation.
SF6 three phase
checking
or
SF6 one phase
checking
FK3--12
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...