Installation
Removing (Re--install) the covers of enclosure
for intervention
G31--080EN05
9/10
06--2012
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Re--install covers without cooling system,
(If applicable).
Introduction
After fitting the cover :
D
Connect the voltage connection braid (A)
D
Tighten the Serflex collar (B).
.
A+B
.
B
.
B
.
A
.
B
Sun sheild assembly
(if applicable)
Sun sheild assembly of circuit--breaker on site
.
Refer to the procedure “Sun sheild assembly on the GCB of at site”, see sum-
mary for reference (...31-35.),
.
A
...31 --35.
Sun sheild assembly
VS...GAD01D
Circuit-breaker
General arrangement
.
A
.
A
FKG1F
FKG1X
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...