Installation
Assembly of the circuit breaker on--site
G31--201EN12
11/20
04--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Installing the circuit --breaker -- Step 2
, continued
Connection
Connection of circuit--breaker/busbar enclosures.
.
PROCEED WITH CONNECTION OF BAY/BUSBAR
ENCLOSURES (OUTSIDE ALSTOM Grid SUPPLY RAN-
GE) OTHERWISE TAKE ALL NECESSARIES PRECAU-
TIONS FOR PROTECT THE EQUIPMENT
.
ALL PRECAUTIONS MUST BE TAKEN AT THE TIME
OF ENCLOSURE CONNECTION IN ORDER TO PRO-
TECT THE INTERNAL COMPONENT (VTs, CTs, ISO
COMPOSITE, ...) AND AVOID THE INSIDE ENCLOSURE
POLLUTION.
.
DO NOT MODIFY THE ADJUSTMENTS REALIZED ON
THE BAY (ALTITUDE, LATITUDE).
USE SLEEVES SO AS TO MAKE UP FOR COAXIALITY
FAULTS.
CAUTION !
VS...GAD01D
Circuit-breaker
General arrangement
CONNECTION SLEE-
VES BUSBAR / BAY
ENCLOSURES (OUT-
SIDE ALSTOM Grid
SUPPLY RANGE).
For connection with
welding
CAUTION! : WELDING OF ENCLOSURES EXCEPT PRESSURE
.
ALL PRECAUTIONS MUST BE TAKEN AT THE TIME OF ENCLOSURE
CONNECTION IN ORDER specifically for the welding, TO PROTECT
THE INTERNAL COMPONENT (VTs, CTs, ISO COMPOSITE, ...) AND
AVOID THE INSIDE ENCLOSURE POLLUTION.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...