Installation
Filling with SF
6
gas
M32--001EN06
3/10
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Preparing the SF
6
gas bottle
Process
The table below gives the steps of preparing the SF
6
gas bottle :
Step
Action
Diagram
1
Remove the cover (4) and plug (5)
from the SF
6
gas bottle (6).
5
4
6
SF
6
2
Fit the pressure reducer (8) on the
SF
6
gas bottle (6).
6
8
SF
6
3
Briefly open the SF
6
gas bottle tap
(7) and the cock(9) of the pressure
reducer to eliminate any air inside
the piping (approx. 20 s at low
flow--rate).
7
Open
9
Closed
SF
6
4
Close the SF
6
gas bottle tap (7)
and thecock (9)of the pressure re-
ducer.
NOTE
: Keep the end of the
tube (10) in high position to
keep the SF
6
gas which it con-
tains and to prevent damp air
from entering.
7
10
Closed
9
SF
6
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...