Installation
Filling with SF
6
gas
M32--001EN06
4/10
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Filling with SF
6
gas
Filling pressure
calculation
Calculate the SF
6
gas filling pressure in accordance withthe temperature and
the local atmospheric pressure.
Filling is carried out to calculated pressure plus 0.01 MPa.
See the module “
SF
6
gas monitoring
”.
Filling
The table below gives the steps of the filling with SF
6
gas operation :
7
11
Open
Closed
9
SF
6
10
2
Step
Action
Comment
1
Connect the tube (2) to the filling
tool (10).
2
Open the SF
6
gas bottle tap (7)
and adjust gas output by acting on
the cock (9) of the pressure reduc-
er (reduced flow rate).
Close the tap (7) from time to
time to check pressure on the
gauge (11).
3
Start filling again until the required
pressure is reached.
4
Close in this order : the tap (7),
then the cock (9).
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...