Commissioning
Pre--commissioning inspections
G34--001EN04
1/8
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Presentation
Introduction
After installation of the bay, completion of all earth circuit and electrical con-
nections, it is necessary to perform certain pre--commissioning inspections.
These inspections should be performed with the apparatus ready to be com-
missioned (energized), in other words.
D
LV electrical circuits conforming, in voltage and type, with the low--voltage
diagrams and rating plate of the apparatus.
D
SF
6
envelopes at rated SF
6
pressure.
NOTE
: Rated pressure, pressure of equipment after SF
6
gas filling.
D
Flexible connections linking circuit--breaker to busbar installed.
Reminder
The measurement values demanded hereafter are to be taken during the test
and inspection programme prior to commissioning and checked with the val-
ues of the “ acceptance criteria” and checking points end of this sheet, then
entered in the pre-commissioning test report (RES..., see summary for refer-
ence)
.
The document RES
... which should then be sent for approval
to
ALSTOM Grid S.A. Customer Service.
.
If, however, the values do not conform with those foreseen in the
acceptation criteria or general characteristics, contact :
ALSTOM Grid S.A. Customer Service.
Caution
DURING OPERATIONS REQUIRED AS PART OF INSPECTION PRO-
GRAMME PRIOR TO COMMISSIONING, ALL POSSIBLE SAFETY PRE-
CAUTIONS SHOULD BE TAKEN TO PROTECT PERSONNEL WORKING
ON THE EQUIPMENT.
See “Product safety sheets”, PS0000EN”
In this module
This module contains the following checking inspections :
Inspections
Page
SF
6
gas
2
Operating device of circuit--breaker
3
Test operations of circuit--breaker
4
Operating device of disconnector(s)
5
Test operations of disconnector(s)
6
Preparing for resumption of service
7
Finish
8
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...