Commissioning
Pre--commissioning inspections
G34--001EN04
5/8
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Operating device of disconnector(s)
(if applicable)
General conditions
The measurements which follow will be performed at nominal voltage of the
coils.
The cabling shall be effectively done.
Note thevoltage supply value and order phase numbering to the motor termi-
nals of the mechanism.
Measurements
TO PROCEED ERECTION MEASURE APPARATUS’ RESISTANCES
(see
...31--401)
.
Various inspections
Check that the following items are working correctly :
-- heating,
-- connections on terminals (no excessive tightening).
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...