GRID
Finish
Subject
D
This subject of this document is to describe the sequence of repair proce-
dures necessary to correct any surface damage to the paint on the GCB
enclosure.
D
It is not in the realms of the procedure to details repair to the enclosure
itself. The supervisor on site is to determine the severity of the damage to the
GCB enclosure (aluminium alloy). This procedure covers damage fom small
scratch’s and scuffs. Greater damage than this would require the intervention
of a site inspector.
Used products
D
Alcohol isopropanol.
D
Paint PU780 (FARBATHANNE NF) (colour RAL 9006).
D
Paintbrush.
D
Emery paper.
D
Not supplied : Cleaning rags, and gloves.
Process
INSPECTION AND CLEAN :
D
Once it has been determined that the damage is limited to only surface
abrasion of the paint, the area of the damage will require cleaning and prepa-
ration.
D
Any mud, dirt orgrease must be removed from aroundthe areato berepai-
red.
D
Mud and dirt can be cleaned and wiped off with wet rags and/or a sponge.
Grease will need to be removed with alcohol. Once complete, leavefor a short
time to dry. Wipe down with a clean rag.
D
Use the emery paper to clean up the damaged area.
D
Wipe away metal dust with a clean rag.
PAINTING :
Open the pot of paint, stir if necessary, if the product has been in storage for
a long period of time.
Using the paintbrush, apply an even coat of paint over the damaged area.
Paint an area slightly larger than the damaged area, covering all the surface
touched by the emery cloth. Thus ensuring a good coverage of the exposed
area.
It have been determined that under normal circumstances one coat of paint
is all that is necessary. Should the client require it a second coat of paint may
be added. To this end please refer to the details printed on the paint pot con-
cerning drying times between paint applications.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...