GRID
Detail of circuit--breaker maintenance operations
, continued
CAUTION : INSPECTION CANCOMMENCEONLY AFTER THECAPACI-
TOR HAS BEEN DISCHARGED AND EARTHED IN A DURABLE WAY.
IF THESE SAFETY INSTRUCTIONS ARE IGNORED, THE PERSONNEL
MAY BE ENDANGERED.
Capacitors
(if applicable)
Check condition of capacitors as follows :
D
clean capacitor insulating surfaces using a dry cloth,
D
check tightening torque of capacitor mountings on the flange of the enclo-
sure, if need be, change sealing washers,
D
make sure that there are no traces of oil or moisture on the capacitors,
D
check the braid connection between the capacitor and the circuit-breaker
casing.
Current transformers
(if applicable)
Check condition of transformers as follows :
D
clean transformer insulating surfaces using a dry cloth,
D
check electrical connections on CT terminal blocks and cubicle,
D
check attachment of CT to the enclosure, tightening to supporting stud
torque.
D
inspect, where applicable, the CT’s braid connection to the mainconductor,
for CT with an electrostatic shield.
Potential
transformers
(where applicable)
Check condition of potential transformers as follows :
D
clean potential transformer insulating surfaces using a dry cloth,
D
check electrical connections on PT terminal blocks and cubicle,
D
check attachment of potential transformer, tightening torque,
D
inspect, the attachments of the braid connection of potential transformer.
Lightning arrester
(where applicable)
Check condition of lighting arrester as follows :
D
clean lightning arrester insulating surfaces using a dry cloth,
D
check attachments of lightning arrester to the pole, tightening torque.
Tightness of
enclosure
(if applicable)
If the enclosure is under pressure, check the tightness of cover seals by ap-
plying a soap solution around the entire periphery of the cover.
Also check tightness of all the enclosure viewports.
Replacement of en-
closure cover seals
(if applicable)
Refer affected section “REPLACEMENT OF ENCLOSURE COVER
SEALS”.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...