Installation
Electrical contact densimeter threshold inspection
G51--101EN03
1/4
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Presentation
Introduction
To realize the electrical contact densimeter threshold inspection, it is
imperative to isolate the densimeter volume from the pole SF
6
gas volume.
Warning
Hazard of asphyxiation
Whenever entering confined spaces there is a danger of death or serious
injury by asphyxiation.
D
Make sure the confined spaces are properly ventilated before personnel
enter.
D
Make sure a person outside of the confined space supervises the work.
D
Obey the look--out/tag--out and permit to work procedures.
D
Make sure escape routes are available and not blocked.
Inspection steps
The electrical contact densimeter inspection must be done in several steps :
Step
Topic
Page
A
Isolating the densimeter
2
B
Densimeter inspection
3
C
Placing the densimeter in communication with the SF
6
volume
4
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...