SAFETY SHEET
ELECTRICAL EQUIPMENT
CAUSE OR ORIGIN OF HAZARD
.
Our equipment is subjected to high and low tension loads that could expose the personnel to the
risk of electrocution.
WORK REQUIREMENTS.
The ope rating company is responsible for ensuring complianc e with the safety instructions
governing high tension.
The basic regulations in respec t of low tension installations must also be c omplied with.
SAFETY INSTRUCTIONS
.
OBSERVE ALL GENERAL INSTRUC TIONS GOVERNING INSTALLATION, C OMMISSIONING AND
OPERATION IN AC C ORDANC E WITH CURRENTLY AC C EPTED PRAC TICES AS WELL AS THOSE LAID
DO WN IN THE DOC UMENTATION SUPPLIED WITH THE EQUIPMENT.
All work on high-tension networks and low-tension installations must be performed by qualified
operators wea ring persona l protec tive c lothing and using the a ppropriate tools and equipment.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...