SAFETY SHEET
M A C H I N E R Y
CAUSE OR ORIGIN OF HAZARD
.
Our equipment contains moving parts (linkage, levers, etc.), reserve power (springs, accumulators,
etc.) and pressurized sheathing ; the associated hazards are dealt with in safety sheet "Pressurized
Equipment" PS 0003/A .
WORK REQUIREMENTS.
Follow the relevant ALSTOM operating and maintenance instructions.
Prior to any work on the control equipment and the motion transfer mechanism, disable the springs
on mechanically operated units and bring p ressure ba ck to zero for hydraulically operated units.
SAFETY INSTRUCTIONS
.
OBSERVE ALL GENERAL INSTRUC TIONS G OVERNING INSTALLATION, C OMMISSIONING AND
OPERATION IN AC C ORDANC E WITH CURRENTLY AC C EPTED PRAC TICES AS WELL AS THOSE LAID
DO WN IN THE DOC UMENTATION SUPPLIED WITH THE EQUIPMENT.
As a general rule, work on the control equipment and transmissions must be performed by qualified
operators wea ring persona l protec tive c lothing and using the a ppropriate tools and equipment.
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...