Description and operation
Pole operation of circuit--breaker
(Interrupting principle)
G13--001EN02
1/4
02--2011
© ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be
relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is
provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is
strictly prohibited.
GRID
Presentation
Introduction
In its ‘CLOSED’ position, the current from a generator passes through :
-- The current sockets (2),
-- The casing (
B
),
-- The permanent contact (21),
-- The moving contact tube (12),
-- The moving contact mounting (10),
-- The casing (
A
),
-- The current sockets (3).
2
21
12
10
B
A
3
Circuit--breaker
Closed
In this module
This module deals with the operational phases of the pole :
Stage
Page
Schematic
diagram
2
Opening
3
Summary of Contents for FKG1X
Page 2: ......
Page 7: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 13: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 17: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 21: ...GRID High Voltage Switchgear This page is intentionally blank...
Page 75: ...This page is intentionally blank This page is intentionally blank...