Content
Instruction Manual
D1821EN/01
5/8
10- 2013
©
ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on
that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without
liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
GRID
Installation
, continued
Connection the vacuum pump
L31- 853EN/03
Installing the synchronous device RPH2
L31- 871EN
/
02
RPH2 - Correspondence between C.B. poles and
the network phases and the phase measuring the
reference voltage
L31- 872EN
/
02
Vacuum operation
L31- 881EN
/
03
Calculation of the SF
6
gas filling pressure
for using the pressure gauge (tool)
L31- 924EN
/
02
Pre- filling with SF
6
gas at 0.05 MPa
L31- 951EN
/
05
Filling with SF
6
gas
L32- 007EN
/
05