Altec AIR CO2-PG80 Purge Gas Generator Operations and Maintenance Manual
SECTION 5 START UP
BEFORE UNIT START UP, FOLLOW THE INSTALLATION
INSTRUCTIONS AND PROCEDURES COMPLETELY.
DO NOT REMOVE, REPAIR OR REPLACE ANY ITEM ON
THE ADSORBER/DRYER WHILE THE ADSORBER/DRYER
IS UNDER PRESSURE.
5.1
INITIAL START UPS
1.
Confirm that all piping and electrical connections are
proper.
2.
Turn on the electrical power. Adsorber/dryer should start
cycling with a small purge noise heard every 30 seconds.
SECTION 6 MAINTENANCE
DO NOT REMOVE, REPAIR, OR REPLACE ANY ITEM ON
THE ADSORBER/DRYER WHILE THE ADSORBER/DRYER IS
UNDER PRESSURE.
BEFORE BEGINNING ANY REPAIRS, MAINTENANCE, OR
INSTALLATION WORK, VERIFY THAT THE POWER IS OFF
AND THE ADSORBER/DRYER IS DEPRESSURIZED.
BEFORE WORKING ON THE ADSORBER/DRYER OR
RELATED EQUIPMENT, ENSURE THAT ALL PERSONNEL
HAVE READ AND UNDERSTAND THE SAFETY AND
OPERATION INSTRUCTIONS IN THIS MANUAL.
6.1
PREVENTIVE MAINTENANCE
Below is a suggested schedule based on average operating
conditions. As conditions such as dirty environment, humidity
conditions, ambient temperature, etc. change, the frequency of
the inspections may need to be increased.
Daily
1.
Inspect the adsorber/dryer for proper cycling.
2.
Inspect inlet filter for proper drain operation.
3.
Verify proper inlet pressure and ambient air temperature
conditions.
Semi-Annually
1. Inspect entire assembly for loose connections, screws,
etc.
Annually
1.
Replace inlet filter elements, outlet filter elements, and
purge mufflers:
Inlet Filter
Element
#M18-02-CG00
#MTP-96-646
Outlet Filter/Regulator
Element
#B03-02-G000
#PS403
Purge Mufflers
#ASN-6 (qty 2)
Bi-Annually
1. Order Maintenance Kit #51325. Replace solenoid valves
wearing parts and check valves parts in adsorber/dryer
manifold. See Figure 3, Item #15, in next section.