page 25
GUTTERING
Gutter Assembly and Fitting
Decide at which end the downpipes will be
located. Use a length of string to give a fall of
1
/
2
”/12mm over every 10’ / 3.04m.
Fix the downpipe brackets into position with
3
/
4
”/
19mm countersunk screws and slide the downpipe
into the brackets and fix loosely with the bolt &
nut. See fig 2.
Drill a 5mm fixing hole in the stop end outlet,
screw it into place with the downpipe connected.
Using a
3
/
4
”/ 19mm screw. See fig 4.
Fix the support brackets fig 3 and joint bracket/s
fig 5 as required for the length of greenhouse. Use
3
/
4
” (19mm) screws. Working from the downpipe
end fix the guttering into the brackets having
trimmed it to length if necessary with a fine saw.
The stop end should finish level with the gable end
of the greenhouse.
Tighten up the downpipe and fix the shoe at the
bottom. See fig 6.
Repeat the process on the other side.
fig 1
see
fig 2
see
fig 4
see
fig 6
see
fig 3
&
5
fig 2
fig 3
fig 5
fig 6
fig 4
IF YOU HAVE A RAINWATER ADAPTOR KIT, PLEASE SEE SEPARATE
INSTRUCTIONS SUPPLIED WITH THE KIT.
Summary of Contents for Amateur 8'0" x 10'6"
Page 31: ...page 31...