38
AB0101
AB0106
Diagram 62
Top Cap and Finial
On the underside of the top cap
(AB0101) mark the centerline, then
measure in from each end by
100mm and make a mark. Drill a
pilot hole at these points. Then
find the centre point of the finial
(AB0106) and mark this. Fix the
two parts together with 50mm
countersunk stainless steel screws.
Line the corners of the top cap up with the roof capping, drill 4 pilot holes through the cap above
the tops of the roof capping. Fix in place with 40mm pan head stainless steel screws (diagram 63
and 64).
50mm
12
AB0106
50mm
100mm
Diagram 63 - Felt Roof
Diagram 64 - Cedar Slatted Roof