23
Frame Assembly
7
Diagram 27
Make sure the side corner bar is located
correctly and the front face is flush with the
end of the eaves bar, mark out the pilot hole
positions shown in diagrams 29 and 30.
Diagrams 31 and 32 on the next page show
the direction the holes should be drilled in.
Diagram 28
Diagram 29
Diagram 30
19mm
30mm
EV04
04
EV0503
EV0503
EV
04
81
EV0414
EV0481
EV0503
80mm C
SK Screw
EV06
11M
38mm
28mm
22mm
41mm
Keep faces flush
Eaves bar
Eaves bar
Top View
Ex
ternal Side
Ex
ternal Front
Ex
ternal