24
Frame Assembly
7
Diagram 32
Diagram 33
Diagram 31
Before fixing this corner make sure the inside
faces are all flush (diagram 31). When you are
happy that the purling is located correctly (it is
normal that the purling is set back slightly
from the glass rebate on the front of the
building) start by inserting the 80mm screw
through the side of the eaves bar into the
tenon on the end of the purling.
Next insert the 100mm screw vertically down
through the roof corner bar into the eaves bar
and finally securing the side corner bar
(diagrams 32 and 33).
Internal
80m
m CS
K Scr
ew
EV
04
81
EV04
14
EV0503
Eaves ba
r
100m
m CSK Screw
100m
m Screw
EV0414
EV
04
81
EV0503
Ex
ternal
X-ray