27
Door Installation
Take the door to the greenhouse frame assembly
and slide it into place. Unlock and open the door
so that it is 90 degrees to the frame as shown in the
illustration on the next page.
You will need to pack the outside edge of the open
door, ideally with a wedge so you have some
adjustment or simply with some scrap cardboard
from the packaging. This will help you get the
frame in the correct position for fixing.
To start with you only need to put 4 fixings in the
frame, one on either side at the top and the same
at the bottom. The 50mm CSK screws should go
through the same face that the strike plate is
mounted on and where the hinges are mounted on
the other side. The back of the frame should line
up with the inside face of the gable glazing bar, this
should then also mean that the glass rebate on the
frame header will line up with the rebate on the
gable glazing bars (diagram 37).
When you are happy with the position of the frame
fix it with the 50mm screws as shown on the next
page. This is only an initial fix and adjustments can
be made later.
8
Diagram 36
Diagram 37
Fix through
this face
Keep faces flush
EV0530
EV0532
EV0505
E
V
0
5
3
2
EV0608
Door Parts
Part Name
Part
Number
Qty
Door Lock
EV0606
1
4” Hinges
EV0607
3
Door Handle Set EV0608
1
Single Door
EV0710
1
EV0710
Ex
ternal
Ex
ternal
Note: door opens
inwards