41
Louvre Assembly
To start building your louvre you first need to assemble the
handed sides. Combine the two side sections with the two
inserts, see diagram 62 to create the side assemblies.
Trim the rubber seal flush with the ends. Attach the top and
bottom of the louvre with the assembly screws in each end.
This locates with a screw channel in the side sections
(diagrams 62 and 63).
Dia. 62 / 63
D166M
D166M
D168LM
D168RM
Louvre x 1
Part Name
Part
Number
Size
(mm)
Qty
Louvre Top/Bottom
D165M
612
2
Louvre Side Insert
D166M
552
2
Louvre Side
D168LM
552
1
Louvre Side (handle) D168RM 552
1
Assembly Screw
02-1864
n/a
4
Louvre Glass
D729TG 100 x
525
6
Internal
D166M
D168LM
D166M
D168LM
D165M
Diagram 63
D165M
Diagram 62
Diagram 64
Makes sure you pinch
the 24 glass retainers as
this helps secure the
glass when in place.
You will find your lou-
vre glass in the box
with the louvre, dia-
gram 64.
It is easier to install the
glass when the louvre
is in the frame of the
greenhouse.
12