48
D201
Gutter and Downpipe Installation
14
Diagram 71
D211
Cut downpipe at 700mm
D207
40m
m
D
20
7
EV0740M
Cut downpipe at 870mm
D207
40mm Screw
D201
Dia. 71
Dia. 72
Dia. 72
Diagram 72
To install the downpipes straight to the
floor cut the pipe as per the diagrams
below. Use a small amount of silicone
at each joint. The brackets can share
the same hole as the capping for the
panels. Use two M6 nuts as washers to
space the brackets out so the pipe run
vertical.