22
Roof Assembly
9
Now install the ridge sections.
Firstly fit the ridge extension
plate (this is the same part as the
eaves braces). Drill 4 pilot holes
as in diagram 25. Space these
about 50-60mm apart with an
80-90mm gap in the middle so
that the fixing screws don’t
interfere with the ridge joint. Fix
this the extension ridge while on
the ground. Lift it into position
and slot one end into the rear of
the greenhouse and rest the
other end on top of the A-frame
(diagram 26).
Diagram 25
80mm Scre
w
50
mm
50
mm
90
mm
Dia. 27
Dia. 25+26
EV0
180
EV
00
90