background image

 

Overview

 

25mm Pan Head  

(Stainless Steel) 

40mm Pan Head  

(Stainless Steel) 

50mm Count

e

rsunk (Stainless Steel) 

Fixes all 

capping and 

metalwork 

Secures side 

bars 

Fixes glazing 

bars to ridge 

and cills 

To fit  your new partition to your greenhouse you will need the following tools: 
 
Spirit Level                            Pencil 
PZ2 Screwdriver Bit           Cordless Screwdriver ( 2 would be ideal, 1 to drill and 1 to screw)         
4mm Drill Bit 

 

     7mm Masonry Bit 

Hammer Dril  

 

     Hammer 

Step ladders                          
 
There are 3 different types of screws used in the installation of the partition.  These are as follows, 
with examples of where to look out for them: 

If you are going to treat the greenhouse yourself  
then it would be best to do it before you begin  
building the frame.   
 
When screwing through one piece of timber into another it is always  
recommended to predrill the first piece.  This will prevent the timber  
from splitting which could weaken the structure.  
 
Glazing the structure is very simple but be very careful of the edges of the glass as  
the pane will break into tiny peaces if you catch an edge on a hard surface such as concrete.  You 
should also wear suitable gloves when handling the glass (this also helps to keep it clean).  It is good 
practice to pre-load the bar capping with screws and position this around the greenhouse ready for 
you when you arrive with the glass.  
 
Take time over fitting the door track and bottom runner as this will be most noticeable if you don’t 
get it right.  This is the one part of the building you will touch and use regularly. 
 
The partition can be added while constructing the roof.  If you have a partition and an extension 
remember the partition can 

not 

be positioned at the join of your main building and the extension.  

 
Option of gluing joints.  This is not required for strength but you may do it if you wish.  However bare 
in mind if you ever intend to move or adapt the greenhouse in the future this would make it very 
difficult.  The best glue for this would be Poly Urethane Wood Adhesive.  Take care when applying 
this, you only need a very small amount as the glue expands to fill the joint.  If you use too much it 
may seep out of the joint and could be unsightly!  Try a test piece before you start.  
 
Read through the rest of this manual before starting, you are less likely to miss something doing this 
and you will have a better understanding of how it all works.   

Summary of Contents for EVOLUTION EIGHT

Page 1: ...06 13...

Page 2: ...2 12 Wide Evolution Cedar Partition Assembly Instructions Contents Introduction Base Preparation Side Assembly Glazing Door Installation Frame Finishing Section 1 2 3 4 5 Page 3 4 5 6 7 8 9 10 14...

Page 3: ...ther vulnerable locations To minimise the risk of wind damage try to select as sheltered a site as possible e g beside a hedgerow or garden fence Additional Considerations Please bear in mind that ass...

Page 4: ...crete You should also wear suitable gloves when handling the glass this also helps to keep it clean It is good practice to pre load the bar capping with screws and position this around the greenhouse...

Page 5: ...stall the aluminium base section Line the 2 base sections up with the side glazing bars as shown below Fit a base bracket to the end that intersects the side base Use a crop head bolt to fit the brack...

Page 6: ...lazing bars Start by drilling pilot holes in the cill section through the mortise holes diagram 3 Also drill 2 holes in the top of the gable glazing bars through the lap joint These should be 25 30mm...

Page 7: ...Base EV0061 Internal When in position with the base flush with the end of the cill in the doorway circled in diagram 5 fix with two 25mm screws at the two points shown in diagram 5 Keep this section s...

Page 8: ...of bars Line up the gable bars with the slots in the roof bars and secure with 40mm screws Don t secure this bar to the ridge or eaves bar at this stage as you will need some adjustment when fitting t...

Page 9: ...xt fit the opposite side to the aluminium base again with two 25mm screws With this section supported insert the door header into the mortise holes in the gable bars diagram 9 Dia 9 Dia 9 Diagram 9 EV...

Page 10: ...Partition Frame Assembly 7 With the door header in place fit the other partition roof bar Again secure this with 40mm screws to the gable bars at the lap joint EV0201 EV0073 Diagram 10 40mm Screw Dia...

Page 11: ...ion you may have to lift the roof bar to do this and also adjust the position of the base joining bracket Once in position make sure it is running parallel with the side glazing bar and fix with 40mm...

Page 12: ...idge This shows the best angle for the screw Again you want to be careful the end of the screw doesn t come through at any point 80mm Screw 5 0 m m S c r e w EV0024 EV0201 Keep a tight fit EV0201 EV00...

Page 13: ...ws All of the capping is pre cut to length so sort through it placing the capping close to where you can reach it Start by glazing a side section and make sure you have the first piece of capping to h...

Page 14: ...side capping to start with fitting this close to the aluminium base you may wish to adjust this once the roof capping is fitted Then do the same for the middle sections and the other side section Onc...

Page 15: ...15 9 Glazing Cdr capping top edge Once all the partition glass is in place you can finally secure it along the top edge with the roof bar capping EV0218 EV0222 EV0218 EV0228 EV0217 Ridge Bar...

Page 16: ...ndle with 25mm round head screws diagram 38 Slide the door glide onto the door guide bracket and then fix to the bottom of the door Keep the down leg of the guide in line with the inside edge of the d...

Page 17: ...s not the case Now fit the threshold section EV0286 in the middle of the door way Locate the bottom edge of the threshold on the top lip of the door runner point 1 and force the threshold down until i...

Page 18: ...same time you need to locate the door guide with the door runner point 7 Holding the door up form the runner below so that it is just located in the runner diagram 42 point 7 fix the track with the fi...

Page 19: ...py with the position of your track and the door is running freely fix the middle screw to the track point 3 Finally attach the vertical supports to each end with a 10mm nut and bolt diagram 43 Using a...

Page 20: ...should be fitted as close to the door as possible while still allowing it to pass by freely Dia 45 You can now install the rebate strips to the inside of your door Pilot hole the strips first It is b...

Page 21: ...n is glazed and the doors are fitted return to your main manual and complete the roof assembly section Once the strips are in place you can fit the door handles on the inside simply line these up with...

Page 22: ...Alton Greenhouses TGP Ltd Blythe Park Cresswell Stoke on Trent ST11 9RD Telephone 01782 385 409 www Altongreenhouses co uk sales altongreenhouses co uk...

Reviews: