background image

 

Staging Installation

 

You can then fit the remaining arms and 
diagonal supports making sure they are 
all level front to back and side to side.   
If you have an extension pack you should 
turn to page 10 to see how to fit the 
staging around the A-frame.  

Diagram 8 

Diagram 9 

Dia. 8 

Dia. 9 

Summary of Contents for EVOLUTION EVSTA1204M

Page 1: ...1 07 20...

Page 2: ...2 Staging and Shelving Instructions Contents Shelving Installation Staging Installation Shelving Extension Staging Extension Fitting around a partition Packing List Page 3 5 6 8 9 10 11 12 13 14 16...

Page 3: ...helving around this Once all the small brackets are fitted you can attach the first staging arm diagram 1 Fit a diagonal support to the arm on the first slotted hole then attach one of the small brack...

Page 4: ...enhouse You can then fit the remaining arms and diagonal supports making sure they are all level front to back and side to side If you have an extension pack you should turn to page 8 now to complete...

Page 5: ...s Insert 1 bolt into the channel diagram 5 for every arm Now turn the first slat over and locate the bolts with the arms start at one end loosely fitting the nuts to the bolts Repeat this for the seco...

Page 6: ...t If you are planning on sitting at the staging you may want to consider fitting it at 750mm from the floor Once all the small brackets are fitted you can attach the first staging arm diagram 7 Fix it...

Page 7: ...the remaining arms and diagonal supports making sure they are all level front to back and side to side If you have an extension pack you should turn to page 10 to see how to fit the staging around the...

Page 8: ...staging arms Insert 1 bolt into the channel diagram 10 for every arm Now turn the first slat over and locate the bolts with the arms start at one end loosely fitting the nuts to the bolts Repeat this...

Page 9: ...de burr any sharp edges Now fit the slats to the shelving arms as on page 5 Fit the shelving arms as before at the set distance down from the eaves bar 300mm You will need to fit an arm both sides of...

Page 10: ...can rest the rear slat in place to mark where you need notch it It should be something like diagram 15 Once you are happy with where to notch the slat use a hacksaw to cut it de burring any sharp edge...

Page 11: ...he A frame side bar Make sure this is level front to back and also level with the next staging arm along Once you are happy with the positioning of the staging arms you can start to fit the staging sl...

Page 12: ...n This means the 6ft run would fit in the back of the partition without modification and the 10ft run would just need cutting down to size In this scenario you would trim 12mm of the end of each 10ft...

Page 13: ...Diagram 17 Diagram 18 Fitting shelving is exactly the same as staging just cut the slats down to size Remember you may have to notch a shelving slat to fit round an A frame see page 10 for advise on h...

Page 14: ...M6 Bolt Stainless Steel HE576 10 22 M6 Nut Stainless Steel HE579 22 25mm Pan Poz Stainless Steel EV0331 25 10 12 10ft Shelving Pack EVSTA1210M Atlas staging slat 10 EV0343M 3096 2 Atlas Shelf Arm 12...

Page 15: ...8 20 8ft Staging Pack EVSTA2008M Atlas staging slat 8 EV0342M 2466 3 Atlas staging Arm 18 EV0346M 505 5 Diagonal Staging Support EV0349M 700 3 Small Bracket HE300M 7 M6 Bolt Stainless Steel HE576 10 2...

Page 16: ...M6 Bolt Stainless Steel HE576 10 30 M6 Nut Stainless Steel HE564 30 25mm Pan Poz Stainless Steel EV0331 25 10 25 10ft Staging Pack EVSTA2510M Atlas staging slat 10 EV0343M 3096 4 Atlas staging Arm 25...

Page 17: ...17 50mm Notes...

Page 18: ...Alton Greenhouses TGP Ltd Blythe Park Cresswell Stoke on Trent ST11 9RD Telephone 01782 385 409 www Altongreenhouses co uk sales altongreenhouses co uk...

Reviews: